<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	>

<channel>
	<title>Western Renewable Energy</title>
	<atom:link href="http://westernrenew.co.uk/blog/?feed=rss2" rel="self" type="application/rss+xml" />
	<link>http://westernrenew.co.uk/blog</link>
	<description>Just another WordPress weblog</description>
	<pubDate>Thu, 12 Aug 2010 17:19:14 +0000</pubDate>
	<generator>http://wordpress.org/?v=2.6.1</generator>
	<language>en</language>
			<item>
		<title>August updates</title>
		<link>http://westernrenew.co.uk/blog/?p=153</link>
		<comments>http://westernrenew.co.uk/blog/?p=153#comments</comments>
		<pubDate>Thu, 12 Aug 2010 17:15:47 +0000</pubDate>
		<dc:creator>wre</dc:creator>
		
		<category><![CDATA[WRE updates]]></category>

		<guid isPermaLink="false">http://westernrenew.co.uk/blog/?p=153</guid>
		<description><![CDATA[As so often, whilst the summer brings mixed weather for tourists in the Westcountry, WRE is hard at work making use of the drier weather to carry out construction of hydro schemes.  We are working at two sites, one for the National Trust, is just starting, and another for a private client is moving toward [...]]]></description>
			<content:encoded><![CDATA[<p class="MsoNormal" style="margin: 0cm 0cm 0pt; text-align: justify;"><span style="color: #ffffff;"><span style="font-size: small;"><span style="font-family: Arial;">As so often, whilst the summer brings mixed weather for tourists in the Westcountry, WRE is hard at work making use of the drier weather to carry out construction of hydro schemes.<span style="mso-spacerun: yes;">  </span>We are working at two sites, one for the National Trust, is just starting, and another for a private client is moving toward completion.<span style="mso-spacerun: yes;">  </span></span></span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; text-align: justify;"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> </span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; text-align: justify;"><span style="font-size: small;"><span style="font-family: Arial;"><span style="color: #ffffff;">The private client has carried out most of the works himself, with WRE doing design and specification of the system, and fitting and commissioning the system.<span style="mso-spacerun: yes;">  </span>The turbine is a very neat and compact machine from Ecowave Systems, which has been specified as it offered a small and quiet machine, at a good price from a </span><span style="color: #ffffff;">UK</span><span style="color: #ffffff;"> supplier.<span style="mso-spacerun: yes;">  </span>Pleasingly the delivery was relatively fast, and we will report on the performance of this model, as it is the first from this manufacturer that we have installed.</span></span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; text-align: justify;"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> <a href="http://westernrenew.co.uk/blog/wp-content/uploads/2010/08/sdc10220.jpg"><img class="aligncenter size-medium wp-image-154" title="sdc10220" src="http://westernrenew.co.uk/blog/wp-content/uploads/2010/08/sdc10220-300x225.jpg" alt="" width="300" height="225" /></a></span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; text-align: justify;"><span style="font-size: small;"><span style="font-family: Arial;"><span style="color: #ffffff;">The National Trust site is at Cotehele in </span><span style="color: #ffffff;">Cornwall</span><span style="color: #ffffff;">, and despite wet ground conditions and difficult access (as ever), progress is good.<span style="mso-spacerun: yes;">  </span>WRE has designed and gained licenses for this site, and is doing all the installation and commissioning, in the coming months.<span style="mso-spacerun: yes;">  </span>This system uses a sturdy JLA turbine.</span></span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; text-align: justify;"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> <a href="http://westernrenew.co.uk/blog/wp-content/uploads/2010/08/sdc10209.jpg"><img class="aligncenter size-medium wp-image-155" title="sdc10209" src="http://westernrenew.co.uk/blog/wp-content/uploads/2010/08/sdc10209-300x225.jpg" alt="" width="300" height="225" /></a></span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; text-align: justify;"><span style="color: #ffffff;"><span style="font-size: small;"><span style="font-family: Arial;">Further work for the National Trust is continuing, with progress on sites in the Westcountry, hopefully which will lead to installation in 2011/12.</span></span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; text-align: justify;"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> </span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; text-align: justify;"><span style="color: #ffffff;"><span style="font-size: small;"><span style="font-family: Arial;">Work for later in the year covers Screw, Crossflow and Pelton systems, with potentially hundreds of kW of installed capacity following in the next 12 months.</span></span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; text-align: justify;"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> </span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; text-align: justify;"><span style="color: #ffffff;"><span style="font-size: small;"><span style="font-family: Arial;">Look out for the website updates shortly.</span></span></span></p>
]]></content:encoded>
			<wfw:commentRss>http://westernrenew.co.uk/blog/?feed=rss2&amp;p=153</wfw:commentRss>
		</item>
		<item>
		<title>Tipton Hydro</title>
		<link>http://westernrenew.co.uk/blog/?p=149</link>
		<comments>http://westernrenew.co.uk/blog/?p=149#comments</comments>
		<pubDate>Sun, 01 Aug 2010 16:29:42 +0000</pubDate>
		<dc:creator>wre</dc:creator>
		
		<category><![CDATA[WRE updates]]></category>

		<guid isPermaLink="false">http://westernrenew.co.uk/blog/?p=149</guid>
		<description><![CDATA[
]]></description>
			<content:encoded><![CDATA[<p><a href="http://westernrenew.co.uk/blog/wp-content/uploads/2010/08/sdc10200.jpg"><img class="aligncenter size-medium wp-image-151" title="sdc10200" src="http://westernrenew.co.uk/blog/wp-content/uploads/2010/08/sdc10200-300x225.jpg" alt="" width="300" height="225" /></a><a href="http://westernrenew.co.uk/blog/wp-content/uploads/2010/08/sdc10199.jpg"><img class="aligncenter size-medium wp-image-150" title="sdc10199" src="http://westernrenew.co.uk/blog/wp-content/uploads/2010/08/sdc10199-300x225.jpg" alt="" width="300" height="225" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://westernrenew.co.uk/blog/?feed=rss2&amp;p=149</wfw:commentRss>
		</item>
		<item>
		<title>Hydro scheme, River Otter, Devon</title>
		<link>http://westernrenew.co.uk/blog/?p=147</link>
		<comments>http://westernrenew.co.uk/blog/?p=147#comments</comments>
		<pubDate>Fri, 07 May 2010 16:41:41 +0000</pubDate>
		<dc:creator>wre</dc:creator>
		
		<category><![CDATA[WRE updates]]></category>

		<guid isPermaLink="false">http://westernrenew.co.uk/blog/?p=147</guid>
		<description><![CDATA[WRE has recently started construction of a 28kW hydro plant at Tipton St John in East Devon.  After a long licensing process, including a successful appeal a license was issued in June 2009.  Unfortunately, due to the tight restrictions on timing it was not possible to start construction until 2010.  However, after receiving the necessary [...]]]></description>
			<content:encoded><![CDATA[<p class="MsoNormal" style="margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="font-size: small;"><span style="font-family: Arial;"><span style="color: white;" lang="EN-GB">WRE has recently started construction of a 28kW hydro plant at Tipton St John in </span><span style="color: white;" lang="EN-GB">East Devon</span><span style="color: white;" lang="EN-GB">.<span style="mso-spacerun: yes;">  </span>After a long licensing process, including a successful appeal a license was issued in June 2009.<span style="mso-spacerun: yes;">  </span>Unfortunately, due to the tight restrictions on timing it was not possible to start construction until 2010.<span style="mso-spacerun: yes;">  </span>However, after receiving the necessary Flood Defence Consent, Planning Permission, and carrying out the necessary ecological work, fish rescue and agreeing to the archaeological conditions, preparatory work finally got underway this week.<span style="mso-spacerun: yes;">  </span>The undergrowth has been cleared, and the leat dredged, and with good ground conditions and weather concrete will be poured in the next couple of weeks.<span style="mso-spacerun: yes;">  </span>Commissioning is anticipated to be in August, water flow permitting.</span></span></span></p>
<p><span style="font-size: small;"><span style="font-family: Arial;"><span style="color: white;" lang="EN-GB"></p>
<div id="attachment_145" class="wp-caption aligncenter" style="width: 310px"><a href="http://westernrenew.co.uk/blog/wp-content/uploads/2010/05/sdc11245.jpg"><img class="size-medium wp-image-145" title="sdc11245" src="http://westernrenew.co.uk/blog/wp-content/uploads/2010/05/sdc11245-300x225.jpg" alt="Electro fishing the leat" width="300" height="225" /></a><p class="wp-caption-text">Electro fishing the leat</p></div>
<p></span></p>
<p></span></span></p>
]]></content:encoded>
			<wfw:commentRss>http://westernrenew.co.uk/blog/?feed=rss2&amp;p=147</wfw:commentRss>
		</item>
		<item>
		<title>News Round-up</title>
		<link>http://westernrenew.co.uk/blog/?p=139</link>
		<comments>http://westernrenew.co.uk/blog/?p=139#comments</comments>
		<pubDate>Wed, 17 Mar 2010 17:05:12 +0000</pubDate>
		<dc:creator>wre</dc:creator>
		
		<category><![CDATA[WRE updates]]></category>

		<guid isPermaLink="false">http://westernrenew.co.uk/blog/?p=139</guid>
		<description><![CDATA[Feed in Tariff update
 
The Feed-in-Tariff (FiT) is close to becoming law, and it is likely that it will be a requirement of all systems that they will need to be designed and installed by Microgeneration Certification Scheme (MCS) approved installers, using approved equipment.  
 
The aim of the MCS is to provide consumer protection for schemes [...]]]></description>
			<content:encoded><![CDATA[<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><strong style="mso-bidi-font-weight: normal"><span style="color: #ffffff;"><span style="font-size: small;"><span style="font-family: Arial;">Feed in Tariff update</span></span></span></strong></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> </span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="font-size: small;"><span style="font-family: Arial;"><span style="color: #ffffff;">The Feed-in-Tariff (FiT) is close to becoming law, and it is likely that it will be a requirement of all systems that they will need to be designed and installed by Microgeneration Certification Scheme (</span><span style="color: #ffffff;">MCS</span><span style="color: #ffffff;">) approved installers, using approved equipment.<span style="mso-spacerun: yes">  </span></span></span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> </span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="font-size: small;"><span style="font-family: Arial;"><span style="color: #ffffff;">The aim of the </span><span style="color: #ffffff;">MCS</span><span style="color: #ffffff;"> is to provide consumer protection for schemes under 50kW output, in what is a fast developing market.<span style="mso-spacerun: yes">  </span>There has been some degree of resistance within the hydro community since many schemes are typically built with some owner input, but if approached carefully this can still be the case.<span style="mso-spacerun: yes">  </span></span></span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> </span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="font-size: small;"><span style="font-family: Arial;"><span style="color: #ffffff;">WRE expects to enter the </span><span style="color: #ffffff;">MCS</span><span style="color: #ffffff;"> scheme at its launch in the next few weeks, and has been accepted onto the REAL assurance scheme, which is a requirement.<span style="mso-spacerun: yes">  </span>We are expecting to be installing approved schemes from the start of April.</span></span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> </span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="font-size: small;"><span style="font-family: Arial;"><span style="color: #ffffff;">We believe that the </span><span style="color: #ffffff;">MCS</span><span style="color: #ffffff;"> scheme should provide consumer confidence, and it will be important that when looking at designing a hydro system you use an approved, professional firm from feasibility study onwards.<span style="mso-spacerun: yes">  </span></span></span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> </span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><strong style="mso-bidi-font-weight: normal"><span style="color: #ffffff;"><span style="font-size: small;"><span style="font-family: Arial;">Screening</span></span></span></strong></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> </span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="color: #ffffff;"><span style="font-size: small;"><span style="font-family: Arial;">WRE is now offering more high quality screening equipment.<span style="mso-spacerun: yes">  </span>In addition to the automatic screeners which are being used increasingly for old mill sites, we are now manufacturing ‘Coanda’ type wedge wire screens, for high head schemes with small flows.<span style="mso-spacerun: yes">  </span>These are ideal as they require no power, are robust and long lasting.<span style="mso-spacerun: yes">  </span>Prices start from £1250 (+ VAT) for a 20 l/s version.</span></span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> <a href="http://westernrenew.co.uk/blog/wp-content/uploads/2010/03/sdc109911.jpg"><img class="size-medium wp-image-142 aligncenter" title="sdc109911" src="http://westernrenew.co.uk/blog/wp-content/uploads/2010/03/sdc109911-300x225.jpg" alt="" width="300" height="225" /></a></span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="font-size: small;"><span style="font-family: Arial;"><span style="color: #ffffff;">We are also manufacturing interface equipment to work with the popular SCS H</span><span style="color: #ffffff;">GP</span><span style="color: #ffffff;"> hydro controller.<span style="mso-spacerun: yes">  </span>This is typically used to operate hydraulic systems where large flow control equipment is needed, such as in low head systems.<span style="mso-spacerun: yes">  </span>Email us for a quote.</span></span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> </span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><strong style="mso-bidi-font-weight: normal"><span style="color: #ffffff;"><span style="font-size: small;"><span style="font-family: Arial;">Installations</span></span></span></strong></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> <img class="aligncenter size-medium wp-image-141" title="sdc10985" src="http://westernrenew.co.uk/blog/wp-content/uploads/2010/03/sdc10985-224x300.jpg" alt="" width="224" height="300" /></span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="font-size: small;"><span style="font-family: Arial;"><span style="color: #ffffff;">WRE has completed work at a site in </span><span style="color: #ffffff;">Devon</span><span style="color: #ffffff;"> where a single jet Pelton machine has been installed.<span style="mso-spacerun: yes">  </span>It is operating as expected, and producing absolutely at the top end of the design expectations of energy capture.</span></span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> </span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="font-size: small;"><span style="font-family: Arial;"><span style="color: #ffffff;">WRE has recently placed orders for two more hydro systems for installation in 2010, a Screw turbine for a site in </span><span style="color: #ffffff;">East Devon</span><span style="color: #ffffff;"> and a crossflow machine for another old mill site in Mid-Devon.<span style="mso-spacerun: yes">  </span></span></span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> </span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="font-size: small;"><span style="font-family: Arial;"><span style="color: #ffffff;">The screw turbine system has been under development for some time, owing to difficulties in licensing, but this will now be delivered in June.<span style="mso-spacerun: yes">  </span>The system is a conventional concrete-trough screw turbine, with a number of design tweaks to boost efficiency.<span style="mso-spacerun: yes">  </span>WRE is the largest installer of Screw turbines in the </span><span style="color: #ffffff;">UK</span><span style="color: #ffffff;">, and is not tied to any manufacturer, meaning we are free to recommend the best machine for the job.</span></span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> </span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="font-size: small;"><span style="font-family: Arial;"><span style="color: #ffffff;">The crossflow turbine is our first order from </span><span style="color: #ffffff;">UK</span><span style="color: #ffffff;"> manufacturer Ecowave, who have been able to commit to an </span><span style="color: #ffffff;">MCS</span><span style="color: #ffffff;"> approved machine in a short lead time.<span style="mso-spacerun: yes">  </span>The system will use 85 l/s on a 5 metre head, and should also be operating by mid-summer.</span></span></span></p>
<p class="MsoNormal" style="MARGIN: 0cm 0cm 0pt; TEXT-ALIGN: justify"><span style="font-size: small;"><span style="font-family: Arial;"><span style="color: #ffffff;"><a href="http://westernrenew.co.uk/blog/wp-content/uploads/2010/03/cf20-400.jpg"><img class="aligncenter size-medium wp-image-143" title="cf20-400" src="http://westernrenew.co.uk/blog/wp-content/uploads/2010/03/cf20-400-300x174.jpg" alt="" width="300" height="174" /></a></span></span></span></p>
]]></content:encoded>
			<wfw:commentRss>http://westernrenew.co.uk/blog/?feed=rss2&amp;p=139</wfw:commentRss>
		</item>
		<item>
		<title>BBC report</title>
		<link>http://westernrenew.co.uk/blog/?p=136</link>
		<comments>http://westernrenew.co.uk/blog/?p=136#comments</comments>
		<pubDate>Fri, 26 Feb 2010 18:41:25 +0000</pubDate>
		<dc:creator>wre</dc:creator>
		
		<category><![CDATA[WRE updates]]></category>

		<guid isPermaLink="false">http://westernrenew.co.uk/blog/?p=136</guid>
		<description><![CDATA[WRE completed work at Dartington Tweed Mill last year; recently the BBC reported briefly on the site, which shows the simple nature of the adaptations.  The reporter talking to Dr Jon Rae from the Dartington Hall Trust is able to carry out his interview with almost no need to raise his voice, despite being right [...]]]></description>
			<content:encoded><![CDATA[<p class="MsoNormal" style="margin: 0cm 0cm 0pt; text-align: justify;"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;">WRE completed work at Dartington Tweed Mill last year; recently the BBC reported briefly on the site, which shows the simple nature of the adaptations.<span style="mso-spacerun: yes;">  </span>The reporter talking to Dr Jon Rae from the Dartington Hall Trust is able to carry out his interview with almost no need to raise his voice, despite being right alongside to gearbox with the machine in operation.<span style="mso-spacerun: yes;">  </span>The report is found at </span><a href="http://news.bbc.co.uk/1/hi/england/devon/8539076.stm"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;">http://news.bbc.co.uk/1/hi/england/devon/8539076.stm</span></span></a><span style="font-size: small;"><span style="font-family: Arial;"> , with the video at the bottom.</span></span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; text-align: justify;"><span style="color: #ffffff;"><span style="font-size: small; font-family: Arial;"> </span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; text-align: justify;"><span style="color: #ffffff;"><span style="font-size: small;"><span style="font-family: Arial;">We have also confirmed the start of installation work at two further sites, a crossflow turbine for the National Trust, and a screw turbine for a private client, both to be running by mid 2010.<span style="mso-spacerun: yes;">  </span></span></span></span></p>
]]></content:encoded>
			<wfw:commentRss>http://westernrenew.co.uk/blog/?feed=rss2&amp;p=136</wfw:commentRss>
		</item>
		<item>
		<title>WRE looks forward to a busy 2010</title>
		<link>http://westernrenew.co.uk/blog/?p=134</link>
		<comments>http://westernrenew.co.uk/blog/?p=134#comments</comments>
		<pubDate>Fri, 15 Jan 2010 18:26:50 +0000</pubDate>
		<dc:creator>wre</dc:creator>
		
		<category><![CDATA[WRE updates]]></category>

		<guid isPermaLink="false">http://westernrenew.co.uk/blog/?p=134</guid>
		<description><![CDATA[2010 has started briskly for WRE, with many projects progressing.  WRE has recently been appointed to carry out detailed design on a number of sizable and high profile hydro systems and has a further 7 abstraction applications submitted, ranging from 70 l/s to nearly 7000 l/s, and many schemes either formally submitted to planning or [...]]]></description>
			<content:encoded><![CDATA[<p class="MsoNormal" style="margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="color: white;" lang="EN-GB"><span style="font-size: small;"><span style="font-family: Arial;">2010 has started briskly for WRE, with many projects progressing.<span style="mso-spacerun: yes;">  </span>WRE has recently been appointed to carry out detailed design on a number of sizable and high profile hydro systems and has a further 7 abstraction applications submitted, ranging from 70 l/s to nearly 7000 l/s, and many schemes either formally submitted to planning or close to being so.<span style="mso-spacerun: yes;">  </span>WRE has recently commissioned a community hydro scheme for Settle Hydro, via our ongoing relationship with Water Power Enterprises.<span style="mso-spacerun: yes;">  </span>In addition to the planned installation work for the year, which will cover Pelton, Crossflow and Screw Turbine systems, WRE has taken on work for upgrade and maintenance work on a number of existing hydro schemes in the South West of England.<span style="mso-spacerun: yes;">  </span></span></span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="color: white;" lang="EN-GB"><span style="font-size: small;"><span style="font-family: Arial;">WRE continues to contribute to industry panels on the Feed In Tariff, and looks forward to the formal announcements on the level of support in the next few weeks.</span></span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="color: white;" lang="EN-GB"><span style="font-size: small;"><span style="font-family: Arial;"></span></span></span></p>
]]></content:encoded>
			<wfw:commentRss>http://westernrenew.co.uk/blog/?feed=rss2&amp;p=134</wfw:commentRss>
		</item>
		<item>
		<title>Merry Christmas from WRE</title>
		<link>http://westernrenew.co.uk/blog/?p=132</link>
		<comments>http://westernrenew.co.uk/blog/?p=132#comments</comments>
		<pubDate>Fri, 18 Dec 2009 12:39:14 +0000</pubDate>
		<dc:creator>wre</dc:creator>
		
		<category><![CDATA[WRE updates]]></category>

		<guid isPermaLink="false">http://westernrenew.co.uk/blog/?p=132</guid>
		<description><![CDATA[The WRE office will be closed from 5pm on Wednesday 23rd December
and re-opens on Monday 4th January.
 
We wish you a very happy Christmas and best wishes for the New Year.
 
]]></description>
			<content:encoded><![CDATA[<p class="MsoNormal" style="margin: 0cm 0cm 0pt; line-height: 150%;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;">The WRE office will be closed from </span><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;">5pm</span><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;"> on Wednesday 23<sup>rd</sup> December</span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; line-height: 150%; text-align: center;" align="center"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;">and re-opens on Monday 4<sup>th</sup> January.</span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; line-height: 150%; text-align: center;" align="center"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;"> </span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; line-height: 150%; text-align: center;" align="center"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;">We wish you a very happy Christmas and best wishes for the New Year.</span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; line-height: 150%;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;"> </span></p>
]]></content:encoded>
			<wfw:commentRss>http://westernrenew.co.uk/blog/?feed=rss2&amp;p=132</wfw:commentRss>
		</item>
		<item>
		<title>New recruit for WRE Ltd</title>
		<link>http://westernrenew.co.uk/blog/?p=129</link>
		<comments>http://westernrenew.co.uk/blog/?p=129#comments</comments>
		<pubDate>Mon, 30 Nov 2009 18:02:44 +0000</pubDate>
		<dc:creator>wre</dc:creator>
		
		<category><![CDATA[WRE updates]]></category>

		<guid isPermaLink="false">http://westernrenew.co.uk/blog/?p=129</guid>
		<description><![CDATA[We are pleased to introduce our new Project Engineer joining us from the Geographical Information Systems industry. Since graduating from Cardiff University with a BEng in Mechanical Engineering, Jessica worked in the water industry before gaining valuable experience in GIS. 
 
Having experience in project management as well as a working knowledge of pipes, pumps and [...]]]></description>
			<content:encoded><![CDATA[<p class="MsoNormal" style="text-justify: inter-ideograph; margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;"><a href="http://westernrenew.co.uk/blog/wp-content/uploads/2009/11/jessdscn0387.jpg"><img class="aligncenter size-medium wp-image-130" title="Jess" src="http://westernrenew.co.uk/blog/wp-content/uploads/2009/11/jessdscn0387-300x225.jpg" alt="" width="300" height="225" /></a>We are pleased to introduce our new Project Engineer joining us from the Geographical Information Systems industry. Since graduating from </span><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;">Cardiff</span><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;"> </span><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;">University</span><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;"> with a BEng in Mechanical Engineering, Jessica worked in the water industry before gaining valuable experience in GIS. </span></p>
<p class="MsoNormal" style="text-justify: inter-ideograph; margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;"> </span></p>
<p class="MsoNormal" style="text-justify: inter-ideograph; margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;">Having experience in project management as well as a working knowledge of pipes, pumps and penstocks, Jessica brings valuable knowledge to a highly skilled and growing team.</span></p>
<p class="MsoNormal" style="text-justify: inter-ideograph; margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;"></span></p>
]]></content:encoded>
			<wfw:commentRss>http://westernrenew.co.uk/blog/?feed=rss2&amp;p=129</wfw:commentRss>
		</item>
		<item>
		<title>Work Experience Testimonial</title>
		<link>http://westernrenew.co.uk/blog/?p=125</link>
		<comments>http://westernrenew.co.uk/blog/?p=125#comments</comments>
		<pubDate>Thu, 29 Oct 2009 16:35:56 +0000</pubDate>
		<dc:creator>wre</dc:creator>
		
		<category><![CDATA[WRE updates]]></category>

		<guid isPermaLink="false">http://westernrenew.co.uk/blog/?p=125</guid>
		<description><![CDATA[I had just completed my degree in Mechatronics and asked WRE for some work experience.  In the 6 weeks of work experience, I have seen a huge variety of engineering work.
 
I was on site for 3 weeks, where I helped with the construction of a fish pass, maintenance of a launder, water wheel and weir.  [...]]]></description>
			<content:encoded><![CDATA[<p class="MsoNormal" style="text-justify: inter-ideograph; margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;">I had just completed my degree in Mechatronics and asked WRE for some work experience.<span style="mso-spacerun: yes;">  </span>In the 6 weeks of work experience, I have seen a huge variety of engineering work.</span></p>
<p class="MsoNormal" style="text-justify: inter-ideograph; margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;"> </span></p>
<p class="MsoNormal" style="text-justify: inter-ideograph; margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;">I was on site for 3 weeks, where I helped with the construction of a fish pass, maintenance of a launder, water wheel and weir.<span style="mso-spacerun: yes;">  </span>I also saw the installation of the gearbox, generator and control system.<span style="mso-spacerun: yes;">  </span>The other half of my time was spent in the office where I helped out with design work, including AutoCAD and SketchUp.<span style="mso-spacerun: yes;">  </span>I found this work experience excellent because I saw how a project is completed from design to commissioning.</span></p>
<p class="MsoNormal" style="text-justify: inter-ideograph; margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;"> </span></p>
<p class="MsoNormal" style="text-justify: inter-ideograph; margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;">The staff at WRE are very enthusiastic about micro hydro and are excellent people to work for.<span style="mso-spacerun: yes;">  </span>They were very welcoming and allowed me to see all areas of micro hydro engineering.<span style="mso-spacerun: yes;">  </span>The work was very interesting and all the staff were very helpful with any questions I had.</span></p>
<p class="MsoNormal" style="text-justify: inter-ideograph; margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;"> </span></p>
<p class="MsoNormal" style="text-justify: inter-ideograph; margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;">I was interested in the area of micro hydro before I started my work experience with WRE and now on completing this, I am even more interested in this area and hope to work in this industry in the future.</span></p>
<p class="MsoNormal" style="text-justify: inter-ideograph; margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;"> </span></p>
<p class="MsoNormal" style="text-justify: inter-ideograph; margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;">Kevin Smith</span></p>
<p class="MsoNormal" style="text-justify: inter-ideograph; margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="font-size: 11pt; color: white; line-height: 150%; font-family: Arial;"><a href="http://westernrenew.co.uk/blog/wp-content/uploads/2009/10/kevinsdc10498.jpg"><img class="aligncenter size-medium wp-image-126" title="kevinsdc10498" src="http://westernrenew.co.uk/blog/wp-content/uploads/2009/10/kevinsdc10498-300x225.jpg" alt="" width="300" height="225" /></a></span></p>
]]></content:encoded>
			<wfw:commentRss>http://westernrenew.co.uk/blog/?feed=rss2&amp;p=125</wfw:commentRss>
		</item>
		<item>
		<title>Autumn developments</title>
		<link>http://westernrenew.co.uk/blog/?p=121</link>
		<comments>http://westernrenew.co.uk/blog/?p=121#comments</comments>
		<pubDate>Tue, 27 Oct 2009 21:37:49 +0000</pubDate>
		<dc:creator>wre</dc:creator>
		
		<category><![CDATA[WRE updates]]></category>

		<guid isPermaLink="false">http://westernrenew.co.uk/blog/?p=121</guid>
		<description><![CDATA[WRE completed the harnessing of the Dartington Hall Trust’s waterwheel in early October, shown below is the shaft coupling, gearbox and generator.  This is now generating power for the buildings, whist retaining the interesting historic feature of the wheel.  Whilst it is typically most sensible to replace such a wheel, since it had been maintained [...]]]></description>
			<content:encoded><![CDATA[<p class="MsoNormal" style="margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="color: white;" lang="EN-GB"><span style="font-size: small;"><span style="font-family: Arial;">WRE completed the harnessing of the Dartington Hall Trust’s waterwheel in early October, shown below is the shaft coupling, gearbox and generator.<span style="mso-spacerun: yes;">  </span>This is now generating power for the buildings, whist retaining the interesting historic feature of the wheel.<span style="mso-spacerun: yes;">  </span>Whilst it is typically most sensible to replace such a wheel, since it had been maintained in good condition, it seemed logical to retain it and fit with a gearbox.  It is shown below before fitment of safety guarding.</span></span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="color: white;" lang="EN-GB"><span style="font-size: small; font-family: Arial;"> <a href="http://westernrenew.co.uk/blog/wp-content/uploads/2009/10/sdc10528.jpg"><img class="aligncenter size-medium wp-image-122" title="sdc10528" src="http://westernrenew.co.uk/blog/wp-content/uploads/2009/10/sdc10528-300x225.jpg" alt="" width="300" height="225" /></a></span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="color: white;" lang="EN-GB"><span style="font-size: small;"><span style="font-family: Arial;">Work is also underway at what is likely to be the last installation of 2009, a small Pelton type turbine running off a healthy 55m of gross head.<span style="mso-spacerun: yes;">  </span>WRE have carried out all design and licensing and are manufacturing Coanda type screening for the intake.<span style="mso-spacerun: yes;">  </span>Dependant on delivery times, generation will commence just before or after the New Year.</span></span></span></p>
<p class="MsoNormal" style="margin: 0cm 0cm 0pt; line-height: 150%; text-align: justify;"><span style="color: white;" lang="EN-GB"><span style="font-size: small;"><span style="font-family: Arial;"><a href="http://westernrenew.co.uk/blog/wp-content/uploads/2009/10/sdc10512.jpg"><img class="aligncenter size-medium wp-image-123" title="sdc10512" src="http://westernrenew.co.uk/blog/wp-content/uploads/2009/10/sdc10512-300x225.jpg" alt="" width="300" height="225" /></a></span></span></span></p>
]]></content:encoded>
			<wfw:commentRss>http://westernrenew.co.uk/blog/?feed=rss2&amp;p=121</wfw:commentRss>
		</item>
	</channel>
</rss>
