by RUSSAdmin | Nov 7, 2023 | News
WRE has recently introduced a larger Coanda screen capable of passing 75 litres per metre of weir length, the first delivery to a 100kW plant in mid Wales has already occurred.
by RUSSAdmin | Nov 7, 2023 | News
An interesting comparison of draft tubes from manufacturer Ecowave: WRE has installed both the small one and the large one – the large tube represents the physically biggest turbine manufactured to date by Ecowave. This system is being installed in a site...
by RUSSAdmin | Nov 7, 2023 | News
Forebay area at a site recently restarted after being closed down for around 20 years, now with crossflow turbine operating on 3.1m...